New homes and lot builds
Candlewick still has lots filling in, and a new build behind the gate needs a standard unit from foundation through finish. We coordinate access with the guard shack, note the lot and the builder, and set the unit where the framing crew and the concrete truck both have room.
As the trades change over the months we keep service steady and reposition the unit if the driveway pour or landscaping forces it. Because entry runs through a single gate, we hold a predictable route day so the association always knows when our truck is coming through. Neighbors sit close along the shore, so we keep every unit screened and freshly serviced to stay easy on the eye. Because the whole community shares one entrance, we hold a steady route day the association can count on rather than surprising the gate.
Dock work and shoreline projects
Shoreline lots mean seawall repair, dock rebuilds and boathouse projects, often on soft or sloped ground near the water. We place units on boards where the footing is firm and keep them clear of the lake edge so a service truck is never working on a bank.
For a longer waterfront project we scout the approach first, since the last thing anyone wants is a truck rutting a lakefront yard reaching a poorly placed unit.
Clubhouse and association events
The association runs gatherings at the clubhouse, beach and ball fields, and those events read better with proper restrooms than with a lone portable by the lot. We bring a tidy mix of flushing and ADA-accessible units for a community day, placed near the activity and the parking.
For a wedding or a formal evening at the clubhouse, the climate-controlled trailer with flushing stalls and sinks fits the setting far better, and we service it right before doors so it is fresh when guests arrive.
